The finished Ipe decks have been covered with protective sheeting and OSB board to prevent damage during construction and protect the wood from the elements.
Black Roofing is working on the roof that had to be re-built due to rotting.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
►
2011
(212)
►
October
(5)
►
August
(25)
►
July
(17)
►
June
(43)
►
May
(3)
►
April
(40)
►
March
(26)
►
February
(22)
►
January
(31)
▼
2010
(211)
►
December
(4)
►
November
(16)
►
October
(18)
▼
September
(16)
Stairs, stairs, stairs. Here the view from outsid...
The AV crew has started installing the pre-wire fo...
The landscapers installed stone steps leading to t...
The landscape crew is harvesting stones from the p...
Installation of the exterior stone has begun. Th...
The view from the new corner window in the west Ma...
5 months into construction, the house is taking on...
Pratt Painting's crew has given the eaves a fres...
The finished Ipe decks have been covered with pro...
The entry staircases are taking shape. Here the fi...
The leach field has been prepared for seeding with...
It has been a sad few days here in Boulder with a ...
We took advantage of the down time to visit Bertra...
Last week, John & Tony continued working on the en...
This cute bushy-tailed wood rat (aka pack rat) was...
This bolt anchors the microlam to the foundation ...
►
August
(17)
►
July
(35)
►
June
(30)
►
May
(41)
►
April
(34)
►
2009
(1)
►
November
(1)
About Me
Roy and Dinah
View my complete profile
No comments:
Post a Comment