skip to main
|
skip to sidebar
19 Arrowleaf
Friday, May 7, 2010
The schedule posted were all can see and be inspired.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
►
2011
(212)
►
October
(5)
►
August
(25)
►
July
(17)
►
June
(43)
►
May
(3)
►
April
(40)
►
March
(26)
►
February
(22)
►
January
(31)
▼
2010
(211)
►
December
(4)
►
November
(16)
►
October
(18)
►
September
(16)
►
August
(17)
►
July
(35)
►
June
(30)
▼
May
(41)
Luis and the crew are removing the last of the lov...
The subpanel in the lower mechanical room is hot....
The rock behind bath #3 will soon be hidden from v...
The view down the downstairs hall from the entry, ...
Lou Thackston of Eric Smith Associates, PC -our ar...
The northeast view from the Billiard loft. ...
The Great Room fireplace wall as seen from the Bil...
The stairs from the East Master Bedroom suite to t...
Another trash pick-up: the staff at Western Disp...
Sullivan Septic's backhoe operator was kind enoug...
It snowed again this week, followed by lots of rai...
No title
The PV/solar electric array will be on the hill si...
Here the orange cones are more visible. The white...
Rough electric started this week. Jeff is working...
A view of the kitchen back wall which will house f...
Chris is measuring for the microwave circuit insta...
Working on the Great Room wet bar. You have to be...
Plumbing has begun this week on the east end of t...
Roy's on-site "office" is a busy place. The only ...
It's CU graduation day and Boulder is bustling. A...
No title
Office support/blogger Dinah drops in to check out...
Mr Marmot (the real supervisor) keeps track of com...
No title
The schedule posted were all can see and be inspired.
The opening for the new stairs to the lower level ...
Safety equipment, permit, everything in its place.
It takes about 40 minutes to briskly hike from Map...
No title
The driveway entry of 19 Arrowleaf Ct as seen from...
There is actually plenty of space for parking.
No kidding!
Daily dose of deer.
Meeting with Subs
Working on the East end lower level.
Working on re-constructing the entry - the framers...
The entry ceiling minus the insulation looks like ...
Radon mitigation
New upper windows in the great room are framed in....
Shoring up the ceiling to receive the header for t...
►
April
(34)
►
2009
(1)
►
November
(1)
About Me
Roy and Dinah
View my complete profile
No comments:
Post a Comment