Sunday, July 31, 2011
Before the Devonian stone can be sealed it has to be cleaned, a laborious process.
Looking good.
Arc City is installing the new guard rails.
Several concrete drains should help direct snow melt off the driveway in winter.
The last two column caps still needed to be placed.
Juan and crew handled this tricky project expertly (each cap weighed about 650 lbs).
The gate area was repaved as well.
Tuesday, July 12, 2011
The driveway reconstruction is underway. First the old blacktop had to be removed.
The pavers for the entry plaza were delivered just in time while the old driveway was still passable.
Maneuvering around the crowded entry plaza to make the concrete repairs was a bit tricky
Rick & Taliesin and the rest of the crew worked hard on Saturday and made great progress with the paver installation.
Meanwhile the last of the Devonian stone was placed.
And the TLR guys finished power washing the Black Mystic stone
Today the asphalt work began.
It's looking good!
These column caps still need to be installed.
Brant is manning the wet saw, cutting the edge pavers to finish the entry plaza.
Almost finished.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Followers
Blog Archive
▼
2011
(212)
▼
October
(5)
Peter, Roy & Dinah Newton wish to thank all who wo...
Final inspection passed, Roy thanks inspector Brian.
It's official, our baby is looking for a new fami...
The new entry gate and columns look great!
Finishing the last of the wall at the entry gate a...
►
August
(25)
►
July
(17)
►
June
(43)
►
May
(3)
►
April
(40)
►
March
(26)
►
February
(22)
►
January
(31)
►
2010
(211)
►
December
(4)
►
November
(16)
►
October
(18)
►
September
(16)
►
August
(17)
►
July
(35)
►
June
(30)
►
May
(41)
►
April
(34)
►
2009
(1)
►
November
(1)
About Me
Roy and Dinah
View my complete profile