The driveway reconstruction is underway. First the old blacktop had to be removed.
The pavers for the entry plaza were delivered just in time while the old driveway was still passable.
Maneuvering around the crowded entry plaza to make the concrete repairs was a bit tricky
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
▼
2011
(212)
►
October
(5)
►
August
(25)
▼
July
(17)
Peter and Grace came for a visit recently to chec...
The project is nearing completion. The Entry Plaza.
The Entrance stairs.
The West/North Master shelves and bath.
Bruce K. the owner/creator of the Volcano house ca...
The dining room.The Billiard loft
The kitchen powder roomThe sauna bathroom.
The decks received their final coat of stain this...
It's punch list time. Ricky is checking all the r...
Working on the Anamosa limestone wall.
Before the Devonian stone can be sealed it has to ...
Arc City is installing the new guard rails.Severa...
The last two column caps still needed to be place...
The driveway reconstruction is underway. First th...
Rick & Taliesin and the rest of the crew worked h...
Today the asphalt work began.
These column caps still need to be installed. Bran...
►
June
(43)
►
May
(3)
►
April
(40)
►
March
(26)
►
February
(22)
►
January
(31)
►
2010
(211)
►
December
(4)
►
November
(16)
►
October
(18)
►
September
(16)
►
August
(17)
►
July
(35)
►
June
(30)
►
May
(41)
►
April
(34)
►
2009
(1)
►
November
(1)
About Me
Roy and Dinah
View my complete profile
No comments:
Post a Comment