Friday, August 12, 2011




Still working on the Anamosa wall seams.

Sunday, August 7, 2011

Bitter-sweet!


























Rick is placing Mexican beach pebbles in the entry roof.
The new patio door screens (they are removable should they not be needed
seasonally).



Rick took advantage of slightly cooler temperatures to dig the trench for the low voltage conduit for the phone line and gate control cables.











The junction box, from here it dips under the driveway and travels to the phone pole.
Plants waiting to be planted between the entry plaza and driveway.









The guys planted Russian Sage and ornamental grasses.




Becky (aka Beth) came to finalize the house measurements.
The Custom Stone Fabricators crew are filling the joint lines of the Devonian tiles in the kitchen with epoxy. Todd follows behind with the polishing machine.