Plants waiting to be planted between the entry plaza and driveway.
The guys planted Russian Sage and ornamental grasses.
Becky (aka Beth) came to finalize the house measurements.
The Custom Stone Fabricators crew are filling the joint lines of the Devonian tiles in the kitchen with epoxy. Todd follows behind with the polishing machine.
Lots of help at the job site to install the replacement Miele fridge inclduing Matt of Miele (standing far rt), Steve of Specialty Appliance (
middle standing) and the installers.
This job is now finished. Thanks guys!
Ted of Pratt Painting is filling nail holes.
Angelo is holding up a pane of the elevator glass.
The crew from CNC Glass Works is installing the elevator glass.
The top panel will be tinted opaque to hide some of the elevator mechanics.