Friday, October 15, 2010

After several crane operators told us it couldn't be done, H&S made crane operation on the narrow driveway look like child's play.


Here the steel for the 2-car garage is being installed.











We took advantage of the crane to lift the solar thermal and solar electric (photovoltaic) panels up to the Great Room deck. From there, the transport to the roof was easy.














The solar themal system is in place!




close-up (side view) of the thermal panels.
The stand-offs for the PV panel racking are also in place.







The first batch of kinnikinick is being installed in the retaining wall. The hope is these xeric plants will take root and eventually hide the wall's concrete framework.

Friday, October 1, 2010

The house is drapped in scaffolding this week.



The masons have been working hard and are making great progress.
The dry stack look is perfect.
The masons have to shape each stone with hammer and chisel before placement, a very labor intensive task ... but the result is beautiful.





The driveway is long & steep when you're lugging up boxes of heavy wire. There is simply no room for vehicles at the top right now.

The change from 2 door to single door for the 2-car garage really modernizes the look of the house.





The masons had to move their sand pile to make room for a steel delivery.





The plumbing crew, still smiling at this point.
The tiered rock walls behind the house will help stabilize the mountain side in addition to looking great.