Friday, September 24, 2010

The AV crew has started installing the pre-wire for all of the low voltage control systems. 19+ miles of wire will be installed.

Some of the wire.
This mechanical room was to house much of the HVAC system for the center of the house. Now it will be used mostly for the control systems.





The windows in the den/au pair bedroom
The landscapers installed stone steps leading to the various levels around the house. Here seen from the driveway.


from above






behind the house
The landscape crew is harvesting stones from the property to build beautiful walls along the rear of the house also.



If we had to purchase these rocks they would cost a fortune. The walls will be tiered to hold back the mountain and allow for a row of plantings.

Installation of the exterior stone has begun. The first course is placed on a steel lintel slightly elevated above the concrete to allow for movement of the ground.


The view from the new corner window in the west Master bedroom is amazing.


Thursday, September 16, 2010

5 months into construction, the house is taking on a new look.
Everyone was happy to get back to work and the Arrowleaf parking lot was full to capacity.

Pratt Painting's crew has given the eaves a fresh new look.




Meanwhile TLR & Associates' crew has started wrapping the house in preparation for stucco & stone.