Sunday, October 2, 2011

Peter, Roy & Dinah Newton wish to thank all who worked so diligently on this amazing project including:
ARCHITECT: ESA – Eric Smith & Associates PC - Lou Thaxton; STRUCTURAL ENGINEERING: Gebau Inc; MICROPILE INSTALLATION: Coggins & Sons; SUSTAINABLILITY CONSULTING: Populus Sustainable Design Consulting; LIGHTING DESIGN: LightVision ; INTERIOR DESIGN CONSULTING: C2 Interiors; FRAMING/CARPENTRY: Hickman Construction Inc; MECHANICAL SYSTEMS: Blue Valley Energy LLC; PLUMBING: Matrix Plumbing, Inc; ELECTRIC: Colorado ElectricWorks, Inc;SOLAR ELECTRIC & THERMAL: Energistic Systems LLC/Suntrac Solar; LOW VOLTAGE CONTROL SYSTEMS: RSI –Residential Control Systems; CENTRAL VACUUM: Boschen Technologies; ELEVATORS: HES Elevator Services, Inc; FIRE SPRINKLER: Western States Fire Protection Co; DRYWALL: Gamesa Drywall; PAINTING: Pratt Painting Inc; WINDOWS: Schottenfenster; INSULATION: Colorado Energy Savers LLC; CABINETRY/MILLWORK: Genesis Innovations LLC; STAIR & DECK RAILING: WX Kohler Design Inc; TILING: Fit to be Tiled Inc; WOOD FLOORS: Carlisle Wide Plank; FIREPLACES: Gas Products Corporation; HOT TUB – SAUNA : IHT – International Hot Tub Co; MASON/STONEWORK/STUCCO: TLR & Associates Inc; LANDSCAPE: Landscape Concepts Corporation; TREE CARE/SNOW PLOWING: Blue River Forestry & Tree Care; SEPTIC: Sullivan Septic LLC; RADON SYSTEM: Radon Rover LLC; GUTTERS: Colorado Seamless Gutter Inc; GARAGE DOORS: Raynor Door Authority of Denver; DRIVEWAY GUARDRAILS & STEEL WORK: Arc City Inc; DRIVEWAY ASPHALT: Superior Aggregates Inc; CONCRETE WORK: Total Concrete Services Inc; GATES: Amazing Gates of Colorado; GATE COLUMN MASONRY: Randy Luallin; LOCKSMITH: Buffalo Lock & Key Inc; LIGHT FIXTURES: Inlighten Studios; TILE/CARPET: Atlas Flooring Inc; PLUMBING FIXTURES: Euro Bath & Tile; IPE DECKING & LUMBER : Boulder Lumber Co; ELECTRIC SUPPLIES: CED – Consolidated Electrical Distributors Inc; APPLIANCES: Specialty Appliance.

To see professional photos of the completed home vist: www. 19Arrowleaf.com

If you would like to contact info for any of the subs, email us at: newtonesq@aol.com



Final inspection passed, Roy thanks inspector Brian.
It's official, our baby is looking for a new family to shelter and impress.







The new entry gate and columns look great!

























Finishing the last of the wall at the entry gate area.

Saturday, August 20, 2011

After a final busy week of the 19 Arrowleaf remodel, we were rewarded with a beautiful double rainbow yesterday.









Our extrodinary carpenters enjoy a beer to celebrate the end of the job - how can they possibly top this effort?




Our Devonian Stone saviours of Custom Stone Fabricators are finished as well.
Zane is fine-tuning the walnut handrails.






























Finally it was time for Dave Neiger of Populus to return to test the house's performance/tightness with a blower test, a HERS requirement. Our baby passed with flying colors!



































With the workers mostly out of the way, Colleen came to do her staging magic.
























































The experts' (Colleen, Leyla & Zach) consensus was the Billard light fixture had to go to keep this space functionally more neutral. Here the replacement fixture can be seen.



















The South-east Master














The North-east Master

Friday, August 12, 2011

Tony is working on the first handrail top caps, a painstaking process but a beautiful result.






These pieces will be used on the billiard loft railing as Uwe is
demonstrating.








































Not quite sure where this guy belongs.











Zane is working on the south-east stariway handrail.












The guardrails were painted this week and look sharp.



































Arc City opened up the guardrail for us so the low voltage wires for the gate controls can be routed from the junction box to the gate.







Rick is prepping for the wire feed.























The junction box .